Skip Navigation

Maryland Department of Transportation (MDOT)
Base Realignment and Closure (BRAC)

MDOT BRAC Logo

What’s New?

View the Latest MDOT BRAC-Related Reports & Presentations

What BRAC-Impacted Maryland Installations are Planning To Do By 2011
  ___________________________________________________________________

         View the Latest MDOT BRAC-Related Reports & Presentations

DOD Defense Access Road (DAR) Program Eligible Projects:
 
APG DAR Needs Report
APG SDDC Certification Letter
FGGM DAR Needs Report
FGGM SDDC Certification Letter
 

State Highway Administration’s “Traffic and Intersection Improvement Studies for BRAC” (NOTE: these reports contain the results of SHA’s planning studies; as individual intersections move into the design, right-of-way acquisition, and construction phases, improvements may be refined):

At Fort George G. Meade (January 2009)
At Bethesda National Naval Medical Center(March 2009)
At Aberdeen Proving Ground with Cover Letter (June 2008)

Presentations Made to Local Governments:

Aberdeen Proving Ground area (April 28, 2008)
Fort George G. Meade area (May 5, 2008)
Bethesda NNMC area (May 15, 2008)

What BRAC-Impacted Maryland Installations are Planning To Do By 2011

Read the Final Environmental Impact Statements (FEIS) and Records of Decision (ROD) for:

Bethesda NNMCFEISROD
Fort George G. MeadeFEISROD
Aberdeen Proving GroundFEISROD

BRACtivity
Sign Up

Current Issue
 
Archive

MDOT-BRAC Home

State of Maryland
BRAC ACTION PLAN

BRAC Links &
Online Resources

Contacts

OPCP Home